29.1 C
Lusaka
November 24, 2024
Image default
FeaturedMINING

WearCheck powers through electricity blackouts

WearCheck customers can rest assured that the latest round of loadshedding woes plaguing South Africa will not have a detrimental effect on the processing of samples, as every one of the company’s major laboratories has a powerful back-up generator.

Managing director of WearCheck, Neil Robinson, outlines the company’s power plans, ‘WearCheck is an essential services provider, and many of our clients operate in critically important sectors, such as health care, food production, banking, alternative power generation, aviation, transport and mining. Therefore, despite the significant costs of doing so, we have empowered our labs with the capacity to operate seamlessly with uninterrupted power supplies and generators that kick in automatically as soon as the national electricity supply is cut off  during loadshedding.

‘We are determined to stay ahead of the country’s power struggle, and to provide the usual top quality service to which our customers are accustomed.’

For further information, please visit www.wearcheck.co.za or contact WearCheck on support@wearcheck.co.za, or by telephone (031) 700-5460.

ENDS [165 words]

E: marketing@wearcheck.co.za

W: www.wearcheck.co.za

T: +27 (31) 700-5460

Caption:

Thumbs up to a seamless power solution – WearCheck’s major laboratories in South Africa and beyond are equipped with generators to ensure uninterrupted operation during electricity power outages. The company’s laboratory manager, Meshach Govender (left), and managing director, Neil Robinson, are seen here with the generator at WearCheck’s Durban, Westville, laboratory.

Released on behalf of WearCheck by Just Write Public Relations

Media queries: Sharon 082 8230539 or sharon@justwritepr.co.za

Related posts

Werner Pumps helping to ensure essential wastewater services continue during lockdown

Oliver Masunda

WH Auctioneers set up mining machinery auction in Botswana

Oliver Masunda

First Quantum Minerals records Q2 reductions in copper production in Zambia

Oliver Masunda

Leave a Comment